It's probably hard to imagine, but the majority of the track is going to be underground.
The short stretches of track that will be above ground will be PART of the upper dive,
out of the side of the volcano. And the double track on the far side of the lagoon.
You can see that some of the dirt blocks have been positioned already.
This is the mostly the very basic layout. As I wanted to create a bit
more to the layout. A large helix about where the hills that
dives and twists underground, opposite the volcano.
Currently, the track carries six trains. Which always
keeps a train in the unloading station. Thus far, there has
been no breakdowns, and I established enough block brakes to catch
and shuttle any trains out on the circuit, in case a breakdown should occur.
There should be no trains stuck on the chain blocks, out on the circuit. The launched lift
sections are alternately colored Blue & Red. Chain blocks are in Yellow. Block
brakes in Blue. And the brake run is in Red. I'm not sure if the photo-
track will remain in this location, because you can't put the
photo-track underground. So I'll have to use the land
blocks to cover it up somehow, to make it
"look" like it's underground.
Here are the ratings as they stack up for the moment.
As I said, the majority of the track will be be rebuilt,
underground, as I lift the land tiles up into position.
So these ratings will most likely rise.
You can DL the current version here.
Edited by Wolfman, 12 May 2009 - 11:46 PM.